Installation Criteria for Industrial Heating Systems
Industrial heater installation is not just hanging a unit; gas piping, electrical supply and safety clearances must be planned as a whole.
Mounting height
Radiant heaters are typically mounted at ceiling heights of 4–10 metres. Reflector angle is adjusted to the work area.
Gas and flue safety
Gas pipe diameter, pressure regulator and flue draught must comply with TS EN standards. Bentotherm installation teams provide a test report after commissioning.